Jordan Hidalgo – How Long Does It Take to Renovate a Pool?

Author name

July 25, 2025

If you’re planning a pool renovation, one of the first questions you probably have is: How long will it take to renovate my pool? Whether you’re refreshing an outdated look or fixing structural issues, understanding the pool renovation timeline is essential for planning your backyard transformation.

In this guide, pool expert Jordan Hidalgo breaks down the process step-by-step, helping you know what to expect and how to plan accordingly.

Average Pool Renovation Timeline

The time it takes to renovate a pool typically ranges from 2 to 8 weeks, depending on:

  • The scope of the renovation

  • Type of pool (concrete, vinyl, or fiberglass)

  • Weather conditions

  • Permitting requirements in your area

  • Availability of materials and contractors

Let’s explore each stage to give you a clearer picture.

1. Pool Assessment & Planning (1–2 Weeks)

Before any work begins, a professional contractor will:

  • Inspect the pool’s structure and systems

  • Provide recommendations and design options

  • Offer a detailed estimate and project timeline

Jordan’s Tip: “Don’t skip the inspection—it’s the foundation for a smooth project.”

2. Demolition & Preparation (3–7 Days)

This stage includes:

  • Draining the pool

  • Removing old tile, plaster, coping, or decking

  • Prepping surfaces for new materials

Note: If you’re changing the pool shape or depth, this step may take longer due to excavation work.

3. Structural Repairs or Upgrades (3–10 Days)

Depending on the pool’s condition, you might need:

  • Crack or leak repairs

  • Skimmer or plumbing updates

  • Equipment upgrades (pumps, heaters, filters)

Jordan’s Insight: “This is a great time to add energy-efficient systems or automation features.”

4. Surface Finishing (5–7 Days)

This is where the pool begins to shine. Popular surface options include:

  • Plaster

  • Pebble Tec

  • Quartz finishes

  • Tiles

After the finish is applied, the pool needs time to cure before being refilled.

5. Filling & Balancing Water (2–3 Days)

Once the surface is cured, the pool is filled with water and the chemistry is carefully balanced. This step is critical to protecting your new finish.

6. Optional Add-ons (Varies)

If you’re adding extra features like:

  • LED lighting

  • Waterfalls or fountains

  • New decking or landscaping

…factor in additional time (usually 1–3 weeks, depending on complexity).

Common Delays to Watch Out For

Jordan warns homeowners to prepare for potential slowdowns, such as:

  • Permit delays

  • Weather issues

  • Backordered materials

  • Unforeseen repairs

Planning ahead and working with a reputable contractor can minimize these disruptions.

Final Thoughts

So, how long does it take to renovate a pool? On average, expect about 3 to 6 weeks for standard renovations, but timelines can stretch if your project is more extensive.

Jordan Hidalgo’s key advice:
“The best pool renovations are well-planned and professionally managed. Don’t rush it—your dream pool is worth the wait.”

 

Leave a Comment